The Krasnosilka secondary school of I-III degrees, which is located in the centre of the amalgamated hromada, is being repaired now.
As reported by the Odesa Local Government Development Centre, established with the support of the U-LEAD with Europe Programme and MinRegion, the institution has already been equipped with energy-efficient windows and doors; the floor, ceiling, and bathrooms have been renovated; the heating and sewage systems, electrical wiring have been completely replaced; the fire-fighting system has also been renewed, and the assembly hall has been repaired. A lift for people with disabilities is made at the entrance instead of a ramp.
Now workers are warming facades, carring out internal repairs of the third, second and partially the first floors, in particular - of the dining room.
The full version is available in Ukrainian – please click HERE
Attached images:
Tags:
Область:
Одеська областьГромади:
Красносільська сільська об’єднана територіальна громадаSource:
Одеський Центр розвитку місцевого самоврядування
26 October 2026
Стратегічне мислення, сталий розвиток і...
Фото SKEW ( Engagement global) Муніципальні партнерства є дієвим інструментом євроінтеграції України. Це...
26 October 2026
How to keep youth in the village? Experience of Keretsky community
How to keep youth in the village? Experience of...
How Keretsky community in Zakarpattia region seriously approached career guidance for young people, and what the...
26 October 2026
Locally-Led Recovery: Polaris Experts Present...
On 20–21 October, a launch conference was held in Lviv, during which eight hromadas joined the Polaris Programme as...
26 October 2026
III International Forum on Agglomerations: How communities in Europe address common challenges
III International Forum on Agglomerations: How...
Residents commute between communities for work and study, and use shared transport and engineering infrastructure....